• The Contractor will carry ID so as to be identifiable to residents.
• The Contractor and any employees will conduct themselves in a courteous and professional manner.
• Smoking and the consumption of alcohol is not permitted.
• Any noise, smells, fumes and other forms of pollution and nuisance are to be kept to the minimum required to carry out the Works.
• The number of Contractor vehicles on site will be kept to the minimum possible.
• There must be no inappropriate comments or the use of inappropriate language.
• Only materials required to carry out the Works are to be brought onto the development.
• All working areas are to be left in a safe and clean condition including the removal of all debris, rubbish and anything else that could constitute a hazard.
• All materials and equipment are to be properly secured.
• All access ladders are to be removed or made unscalable.
• Any surplus or unprotected materials are to be taken away.
• Scaffolding is to be properly secured.
• If hot works has been carried out, such works should cease at least one hour before leaving site and thorough visual inspection must be made to ensure no combustible materials have caught.